Data Processing Centre INTERCONEXION MAD-4
- Promoter: Interxion
- Date: 2022-2023
- Location: Madrid (Spain)
- Service: Construction consultancy and PMO
- Subservice: BIM Management
Challenge
With 29,460 square meters and 6 floors, the INTERXION MAD4 data processing center is the largest in the capital, with a capacity of 34 MW of power and the capacity to store 140,000 servers.
The work has a budget of 230 millions.
Our work
Ayesa collaborates in the generation of the As-Built model of the diesel installations that are used to cool the servers in the case of a failure.